top of page
Broward College Health Science Simulation Center
Broward College Health Science Simulation Center 2

LOCATION

Davie, FL

 

OWNER

Broward College

 

PROJECT COST

$17.7M

 

COMPLETION DATE

12/2013

BROWARD COLLEGE HEALTH SCIENCES SIMULATOR CENTER BUILDING NO.8

D. Stephenson Construction is currently providing Construction Management at Risk Services for the new construction of the Broward College Health Sciences Simulator Center Building #8, Central Campus. The scope includes the new construction of 7 state-for-the-art labs, which are equipped with human patient simulators and bedside computers; specialized hospital equipment specifi c to the function of each lab; internet access; digitalized video; recording cameras and TV monitors; computer assisted instructional software / and or other interactive software. The labs are designed to replicate realistic practice settings and will have an EMS ambulance bay, and emergency Department, Critical Care units, Medical-Surgical unit, Trauma/Operating/Dental Room, and a Labor and Delivery/Neonatal Intensive Care/ Pediatric unit; and open lab space to conduct large clinical drills/as well as debriefi ng rooms, storage space, and video recording control rooms. Each patient care unit will accomodate 6 students and an instructor, and have an adjoining control room and storage space. This is a LEED Silver project.

bottom of page